Save and reopen an office site project, pack it together with its linked drawing, unpack to a separate folder and validate the restored project.

16Boreholes
-1.13 °CMinimum mean fluid temperature
16.42 °CMaximum mean fluid temperature
1Variants compared
01 / Project

What the example does

A project with a linked drawing (the site plan) is saved, reopened, packed into one archive with its drawing, unpacked in another folder and checked. Undo and redo, recent files and the project notes are part of the same workflow.

Inputs

InputValue
Field16 boreholes, free positions
Boreholeslength 150.0 m, top 4.0 m below the surface, diameter 140 mm
Constructionsingle U, PE pipe 32 × 2.9 mm, shank spacing 70 mm, grout 1.60 W/(m·K)
Groundthermal conductivity 2.60 W/(m·K), heat capacity 2.20 MJ/(m³·K), surface temperature 9.0 °C, geothermal heat flux 0.060 W/m²
Fluid and flow25 % monopropylene glycol, 0.50 l/s per borehole
Loadsmonthly: heating 200 MWh, hot water 8 MWh and cooling 45 MWh per year; peaks 100 kW heating and 45 kW cooling for 6 h
Heat pumpseasonal performance factors 3.8 heating, 2.8 hot water, 5.0 cooling
Design limitsmean fluid temperature between −3.0 °C and 20.0 °C
Period25 years
Linked filesite plan drawing (DXF)

Run the example in BoreTherm

  1. Open Project: the name, the notes and the file.
  2. Pack project writes one archive with the project and its linked files; Unpack project restores it in a folder of your choice.
  3. Open the unpacked project and press Calculate: the result is the same.
02 / How BoreTherm calculates it

What a packed project contains

1 Projectall inputs and settingsin one file2 Linked filessite plan drawing,time series3 Archivefiles + manifest withsizes and SHA-2564 Unpackpaths rewritten to thenew folder5 Validateinputs checked strictly;hashes comparedRestored project valid; same results
Packing keeps a project and its drawings together.
  1. ProjectThe project file holds every input; results are recalculated.
  2. Linked filesDrawings and time series are referenced by path.
  3. ArchiveThe archive stores them with a manifest of sizes and checksums.
  4. UnpackThe references are set to the new location.
  5. ValidateThe restored project is checked before it is used.
03 / In BoreTherm

The example in BoreTherm

Project: name, notes, file and the pack and unpack buttons.
Project: name, notes, file and the pack and unpack buttons.
The linked site plan in the site view of the Field layout page.
The linked site plan in the site view of the Field layout page.
04 / Results

Calculated results

Calculated with BoreTherm for every variant of the example. Displayed values are rounded.

Packaging resultValue
Packed entries1
Unpacked projectProject management - Project management
Restored input validationTrue
Project management results plotted from BoreTherm output
Chart of the BoreTherm results in the tables of this section.

Temperatures by variant

VariantBoreholesLength H [m]Tf min [°C]Tf max [°C]Rb* [m K/W]Pump [W]Design limits
office on the L-shaped plot16150.000-1.13016.4160.11943,033.2within limits
05 / Discussion

What the example shows