Menus, toolbar and keyboard
File handles projects, imports and portable packs. Edit handles undo/redo. Project opens project-level settings. Calculation runs design calculation, sizing and optimization. Tools opens parameter studies, Monte Carlo and TRT evaluation. View controls theme, graphics, text size and CSV format. Help opens these offline pages and licence notices. Toolbar buttons perform the same actions as their menu entries.
F1 opens help for the selected page or active dialog. F5 Calculate; F6 Size length; F7 Optimize; F8 Parameter study; F9 Monte Carlo; Ctrl+PgUp/PgDn changes page; Alt+0 focuses the input tree. Save before closing. Esc or Cancel requests cancellation where supported.
| Action | Operation | Shortcut |
|---|---|---|
| 2D design | 2D design | |
| 3D analysis | 3D analysis | |
| About BoreTherm | About BoreTherm | |
| About Qt | About Qt | |
| Arrange | Arrange the blocks from left to right along the connections. | |
| Automatic (as the number format) | German number format: Excel (German); otherwise international. | |
| Automatic (software OpenGL in remote sessions) | Automatic (software OpenGL in remote sessions) | |
| BTES | BTES | |
| Bentonite (0.8 W/(m·K)) | Bentonite (0.8 W/(m·K)) | |
| Borehole field | Add the borehole field of this project (at most one per system). | |
| Built-in | Built-in | |
| Buried part | The buried part above each borehole head (dashed). | |
| CSV format | CSV format | |
| Calculate | Simulate the mean fluid temperature over the design period (F5) | F5 |
| Calculation | Calculation | |
| Cement–bentonite (1.1 W/(m·K)) | Cement–bentonite (1.1 W/(m·K)) | |
| Clear list | Clear list | |
| Co-simulation preview | Co-simulation preview | |
| Coaxial 63 × 5.8 / 40 × 3.7 mm, borehole Ø 152 mm | PE 100 pipes, thermally enhanced grout (λ 2.0 W/(m·K)). Typical values; check them against the product data. | |
| Constant | Add a source with a constant value. | |
| Dark | Dark | |
| Delete | Delete the selected blocks and connections (Del). | |
| Design value | Design value | |
| Deutsch | Deutsch | |
| Double U 32 × 2.9 mm, borehole Ø 152 mm | PE 100 pipes, thermally enhanced grout (λ 2.0 W/(m·K)). Typical values; check them against the product data. | |
| Double U 40 × 3.7 mm, borehole Ø 180 mm | PE 100 pipes, thermally enhanced grout (λ 2.0 W/(m·K)). Typical values; check them against the product data. | |
| Drilling area | Drilling area | |
| East | View from the east, looking west. | |
| Edit | Edit | |
| Energy pile Ø 1200 mm, 4 U-tubes 32 × 2.9 mm | Energy pile: concrete λ 1.8 W/(m·K), C 2.2 MJ/(m³·K), PE 100 pipes on the reinforcement cage (75 mm cover). Use the short-time borehole model. Typical values; check them against the pile design. | |
| Energy pile Ø 600 mm, double U 32 × 2.9 mm | Energy pile: concrete λ 1.8 W/(m·K), C 2.2 MJ/(m³·K), PE 100 pipes on the reinforcement cage (75 mm cover). Use the short-time borehole model. Typical values; check them against the pile design. | |
| Energy pile Ø 600 mm, helix 25 × 2.3 mm, pitch 250 mm | Energy pile: concrete λ 1.8 W/(m·K), C 2.2 MJ/(m³·K), PE 100 pipes on the reinforcement cage (75 mm cover). Use the short-time borehole model. Typical values; check them against the pile design. | |
| English | English | |
| Ethanol 24 % | Ethanol 24 % | |
| Examples and getting started | Examples and getting started | |
| Excel (German): separator ; and decimal comma | Opens directly in a German Excel: cells separated by semicolons, numbers like 2,35. | |
| Exit | Exit | |
| Export FMU… | Write the borehole field as an FMI 2.0 Co-Simulation FMU for system simulation tools (Modelica tools, OMSimulator, Python) | |
| Export PDF report… | Write a PDF report with inputs, results and charts (saved report profile) | Ctrl+P |
| Export as PNG… | Export as PNG | |
| Export as SVG… | Export as SVG | |
| Export results (CSV)… | Write the monthly (and hourly) results as CSV | |
| FMU… | Add a Co-Simulation FMU (FMI 2.0, 64-bit Windows). You can also drag .fmu files onto the diagram. | |
| File | File | |
| Fit | Show the whole diagram (Ctrl+0). | |
| Focus input tree | Focus input tree | Alt+0 |
| Full FEM: groundwater flow and heat (TH) | Full FEM: groundwater flow and heat (TH) | |
| Full FEM: transient boreholes | Full FEM: transient boreholes | |
| Germany 2026 (indicative) | Indicative net prices from public sources (2026), not a quote. | |
| Graphics | Graphics | |
| Ground layers | The ground layers as translucent slabs with their names. | |
| Grout λ | Grout λ | |
| Guided examples | Guided examples | |
| Help | Help | |
| Help contents | Help contents | |
| Help for this page | Help for this page | F1 |
| Import legacy project file… | Import a legacy project file (.dat) with the classic-method compatibility options switched on | Ctrl+I |
| Inclined boreholes | Inclined boreholes | |
| Insulated casing (top 0–10 m) | An insulated casing (PE foam, λ = 0.038 W/(m·K), up to 10 mm) from the surface to 10 m: limits the heat exchange near the surface, e.g. under a building or near utilities. | |
| Insulated return leg (top 30 %) | Sleeves (PE foam, up to 10 mm) on the up-going legs over the top 30 % of the active length, against the thermal short-circuit between the legs.Effective for coaxial and deep boreholes and at low flow; at ordinary single-U flows Rb* can rise, because the return leg also exchanges less heat with the ground. Compare Rb* after a calculation. | |
| Insulation λ | Insulation λ | |
| International: separator , and decimal point | For scripts and English software: cells separated by commas, numbers like 2.35. | |
| Isometric | Oblique view from the south-west (also: Home key). | |
| Language | Language | |
| Large | Large | |
| Larger | Larger | Ctrl+= |
| Larger diameter at the top | The top of the borehole, from the surface to D + 10 % of H, drilled 50 mm wider, e.g. through the overburden or a cased section. | |
| Layered ground and groundwater | Layered ground and groundwater | |
| Light | Light | |
| Main | Main | |
| Monoethylene glycol (MEG) 25 % | Monoethylene glycol (MEG) 25 % | |
| Monoethylene glycol (MEG) 33 % | Monoethylene glycol (MEG) 33 % | |
| Monopropylene glycol (MPG) 25 % | Monopropylene glycol (MPG) 25 % | |
| Monopropylene glycol (MPG) 33 % | Monopropylene glycol (MPG) 33 % | |
| Monte Carlo | Monte Carlo | |
| Monte Carlo… | Size (or simulate) for random samples of uncertain inputs: length at 95 % confidence and the inputs that matter most (F9) | F9 |
| My designs | My designs | |
| My fluids | My fluids | |
| My price lists | My price lists | |
| New | Start a new project with default values | Ctrl+N |
| New from example | Office building example: 4×4 field, 150 m, single-U 32 mm, 25 % MPG, 200 MWh/year heating, 45 MWh/year cooling | |
| Next page | Next page | Ctrl+PgDown |
| No-go zone | No-go zone | |
| Normal | Normal | |
| Open recent | Open recent | |
| Open the library folder | Open the library folder | |
| Open… | Open a BoreTherm project (.boretherm) or a legacy project file (.dat) | Ctrl+O |
| Optimization | Optimization | |
| Optimize… | Find the shortest / cheapest layout on a given plot (F7) | F7 |
| PE foam (0.038 W/(m·K)) | PE foam (0.038 W/(m·K)) | |
| PU foam (0.028 W/(m·K)) | PU foam (0.028 W/(m·K)) | |
| PVC casing (0.17 W/(m·K)) | PVC casing (0.17 W/(m·K)) | |
| Pack project… | Write one zip file with the project and every file it links (site plan, FMUs, CSV tables, optionally the TRT data files), to pass the project on | |
| Parameter study | Parameter study | |
| Parametric study… | Vary inputs over a range and size the borehole length (or simulate) at every value (F8) | F8 |
| Perspective | Perspective projection: nearer parts look larger. | |
| Potassium formate 29 % | Potassium formate 29 % | |
| Previous page | Previous page | Ctrl+PgUp |
| Project | Project | |
| Redo | Redo | |
| Reference | Reference | |
| Report… | Choose the report sections, title block and formats (PDF, HTML, Markdown), preview and write the report; automatic reports after calculations | Ctrl+Shift+P |
| Reset to normal | Reset to normal | Ctrl+0 |
| Results summary | Results summary | Ctrl+R |
| Run 3D analysis | Compute the current design with the FEM (3D analysis page) and compare it with the analytic design (Shift+F5) | Shift+F5 |
| Run… | Run the co-simulation (settings on the Settings page). | |
| Save | Save the project | Ctrl+S |
| Save As… | Save As | Ctrl+Shift+S |
| Sections | The borehole sections as thick segments along each borehole. | |
| Show FEM mesh… | Preview the mesh the 3D analysis (FEM) would use (the 3D analysis is off on the Project page) | |
| Show demo results | Fill the result pages with synthetic data (no calculation) | |
| Single U 32 × 2.9 mm, borehole Ø 152 mm | PE 100 pipes, thermally enhanced grout (λ 2.0 W/(m·K)). Typical values; check them against the product data. | |
| Site plan | The site plan on the ground surface, under the boreholes. | |
| Size borehole length | Find the borehole length that just meets the design limits (F6) | F6 |
| Small | Small | |
| Smaller | Smaller | Ctrl+- |
| Software OpenGL (slower, works everywhere) | Software OpenGL (slower, works everywhere) | |
| South | View from the south, looking north. | |
| Steel casing (45 W/(m·K)) | Steel casing (45 W/(m·K)) | |
| System (English) | System (English) | |
| System (as Windows) | System (as Windows) | |
| System OpenGL | System OpenGL | |
| TRT evaluation with data | TRT evaluation with data | |
| TRT evaluation… | Evaluate a thermal response test: import the rig data, check it, estimate λ and R_b* with several methods, and write the values into the project | |
| Text size | Text size | |
| The custom (constant) values | The custom (constant) values | |
| The heat pump in the project | The heat pump in the project | |
| Theme | Theme | |
| Thermally enhanced grout (2.0 W/(m·K)) | Thermally enhanced grout (2.0 W/(m·K)) | |
| Third-party licences… | Third-party licences | |
| Time table… | Add a source from a CSV time table (first column the time, then one column per output; header "name [unit]"). | |
| Tools | Tools | |
| Top | View from above, north up. | |
| Typical designs | Typical designs | |
| Typical fluids | Typical fluids | |
| Undo Units | Undo Units | |
| Undo history… | The list of the changes of the project: click a line to go back to that state | |
| Units… | Units in which this project shows values (temperature, length, power, energy, flow) | |
| Unpack project… | Unpack a zip written by Pack project into a folder and open the project | |
| Utility corridor | Utility corridor | |
| View | View | |
| Water | Water | |
| Zoom in | Zoom in (Ctrl+wheel, Ctrl++). | |
| Zoom out | Zoom out (Ctrl+wheel, Ctrl+−). | |
| as Drilling area | as Drilling area | |
| as No-go zone | as No-go zone | |
| as Reference | as Reference | |
| as Utility corridor | as Utility corridor |