The one idea: λ from the slope, Rb* from the level
A TRT puts a constant heat rate into one borehole for two to three days and logs the inlet and outlet temperatures. After the first hours the mean fluid temperature Tf (the mean of the inlet and outlet temperature) rises on a straight line against the logarithm of time. The slope of that line depends only on the ground conductivity. Its level depends on the undisturbed temperature and on the thermal resistance between the fluid and the borehole wall.
Q = ρ cp V̇ (Tin − Tout)Tf = (Tin + Tout) / 2λ = Q̄ / (4π H k)Rb* = (m − T0) / q̄ − [ln(4α / rb²) − γ] / (4πλ)Tf = T0 + Rb* q̃ + Σ Δqk G(t − tk) / (2πλ)Tf = k ln t + m over the window; Q̄ is the mean heat rate, H the borehole length and q̄ = Q̄/H; C is the volumetric heat capacity of the ground, α = λ/C, rb the borehole radius; γ = 0.5772. G is the response of the borehole to a unit heat rate, modelled as a line source (heat released along the borehole axis, infinite or finite in length) or as a hollow cylinder at the borehole wall, and q̃ the heat rate after a first-order lag of 1 h, the heat capacity of fluid and grout.
The workflow
The evaluation is a wizard with six steps, started from Tools › TRT evaluation…. Two questions decide whether the result is fit for the design: does the test pass its acceptance checks, and is there a fit the program can recommend? A fit is one evaluation method applied to the data; the Monte Carlo of step 5 repeats the evaluation many times with the sensor, power and borehole data varied within their errors.
- Apply defaults: λ (matched to the effective value over the test length in layered ground) and the calibrated grout conductivity are on. The surface temperature from T0, C (only when estimated) and the Darcy velocity are options. Fixed Rb* is the alternative of the classic monthly method to the grout calibration.
How the calculation works
- Power and Tf. The power is the measured column, or ρ cp V̇ ΔT with the fluid properties at the record’s mean temperature. The heating end is the last sample above half the typical power.
- Screening. A Hampel filter (local median ± 4 × 1.4826 × MAD, the median absolute deviation) flags spikes; level changes in flow and power are operating events. Flagged temperatures are left out of the fits by default.
- Quality checks (section 6) give pass, warning or fail, and each fit gets a suitability: suitable, review required or unsuitable.
- T0 is the mean fluid temperature of the circulation before the heating (or manual, or the mean of a depth profile). The window starts at max(10 h, 5 rb²/α).
- Methods. M1: least squares on (ln t, Tf), plus the sequential evaluation (up to 40 window ends and 40 window starts). M2: λ and Rb* (optionally C, T0) by Levenberg–Marquardt on the superposition model, which follows any power history and the recovery, with three kernels: infinite line (ILS), hollow cylinder (CHS), finite line (FLS). M3: moving line source for groundwater. M5: the recovery after the stop.
- Diagnostics and choice. 95 % intervals, the residual autocorrelation and the effective number of independent observations neff, identifiability (whether the data determine the parameters), then the rule below.
The theory behind the window and the methods
Why the window starts late: the sequential evaluation
The line-source slope is only valid when t ≫ rb²/α and the heat capacity of the borehole no longer matters. The sequential plot shows it: M1 is repeated with a moving window end and a moving window start. A good window is where λ is flat.
Why superposition: a test is never perfectly constant
M1 assumes a constant power from the start. A stop, a drift or a daily swing bends the curve and biases the slope. M2 replays the actual power history step by step (temporal superposition, evaluated by FFT), so it can fit through a stop and into the recovery.
Which borehole model, and how sure is λ?
The line source (ILS) is the reference. The hollow cylinder (CHS) puts the heat in at rb but lets the borehole store none, so over usual windows it reads λ some 4–9 % lower than the ILS. A real borehole stores heat in its fluid, pipes and grout, which is closer to the line source; the CHS replaces it only when the data show it clearly (ΔBIC ≥ 10). The synthetic test was generated with the cylinder model, and the rule finds it.
How each result is derived
The synthetic test (150 m, rb 76 mm, recommended fit: M2 superposition (CHS)).
| Result | How BoreTherm derives it | Synthetic test |
|---|---|---|
| Undisturbed temperature T0 | mean Tf of the circulation before the heating (or manual, or a depth profile) | 11.30 °C (initial circulation (30 samples before the heating start)) |
| Mean power Q̄ and q̄ = Q̄ / H | from flow and ΔT: ρ cp V̇ (Tin − Tout) at the mean fluid temperature | 5877 W, 39.2 W/m |
| Evaluation window | from max(10 h, 5 rb² / α) to the heating end; recovery from the window start after the stop | 10–72 h, recovery from 82 h |
| λ and Rb* (M2) | Levenberg–Marquardt on the superposition model of section 1 (T-13.2) over the window and the recovery | λ 2.599 W/(m K), Rb* 0.0850 m K/W |
| 95 % interval of λ | covariance s² (JᵀJ)−1, Student t; assumes independent residuals | 2.597–2.601 (±0.07 %) |
| Effective observations neff | n (1 − r1) / (1 + r1), r1 = lag-1 autocorrelation of the residuals | CHS 1498, ILS 49 of 2278 |
| Model choice | ΔBIC = neff ln(SSRILS / SSRCHS) with the larger r1 of the two; ≥ 10 replaces the ILS | 49.5 · ln((0.0967 / 0.0169)²) = 172.4 → CHS |
| M1 and M5 as checks | M1: slope over the window (unsuitable across the stop); M5: recovery with the kernel of M2 | M1 2.715, M5 2.593 (T0 11.29 °C) |
| Grout conductivity | solves Rb*(kg; test borehole, test flow, mean Tf) = Rb*TRT with the multipole method | 1.60 → 2.48 W/(m K) |
| Surface temperature | shifted so that the undisturbed temperature over the test length equals T0 | 9.00 → 9.57 °C |
Into the design. Applied to the example project (16 boreholes), λ goes from 2.20 to 2.599 W/(m K), the grout and the surface temperature change as above, and the Rb* of the design is recalculated for its own flow and borehole (0.1198 → 0.0942 m K/W). The length from Calculation › Size borehole length goes from 154.5 m to 130.1 m (−16 %). The grout calibration transfers a material property: the project borehole differs from the test borehole, and its Rb* still follows the design flow and length.
The example in numbers
| Check | Limit | Synthetic | Beier sandbox |
|---|---|---|---|
| Heating duration | ≥ 48 h, fail | pass: 72.0 h | pass: 51.8 h |
| Power: sd / mean (10-min means) | ≤ 1.5 %, fail | fail: 14.6 % | pass: 0.5 % |
| Power: largest deviation / mean | ≤ 10 %, fail | fail: 100.8 % | pass: 1.7 % |
| Specific heat rate Q̄ / H | 30–80 W/m, warning | pass: 39.2 W/m | pass: 57.7 W/m |
| Flow: sd / mean | ≤ 5 %, warning | pass: 0.0 % | pass: 0.1 % |
| Reynolds number | ≥ 2300, warning | pass: 19121 | pass: 13221 |
| Energy balance: measured vs flow · ΔT | ≤ 10 %, fail | pass: 0.0 % | pass: 0.1 % |
| Heating interruptions | none, warning | warning: 1 | pass: 0 |
| Operating events (level changes) | none, warning | warning: 2 events | warning: 3 events |
| T0 against Ts + q_geo depth / λ | ≤ 2 K, warning | pass: −0.1 K | n/a: – |
The synthetic test fails the power checks on purpose: the 1.5 h stop. Its suitability is review-required. The Beier test passes the acceptance checks but has 3 operating events, so it is review-required too.
| Method | λ synth. | Rb* synth. | fit, status | λ Beier | Rb* Beier | fit, status |
|---|---|---|---|---|---|---|
| M1 slope | 2.715 | 0.0917 | 0.636 K, neff 2 · unsuitable | 2.923 | 0.1579 | 0.036 K, neff 29 · unsuitable |
| M2 ILS | 2.829 | 0.0956 | 0.097 K, neff 49 · review | 2.831 (rec.) | 0.1548 | 0.053 K, neff 14 · review |
| M2 CHS | 2.599 (rec.) | 0.0850 | 0.017 K, neff 1498 · review | 2.639 | 0.1457 | 0.060 K, neff 18 · review |
| M2 FLS | 2.820 | 0.0955 | 0.097 K, neff 49 · review | 2.746 | 0.1536 | 0.051 K, neff 15 · review |
| M5 recovery | 2.593 | – | 0.014 K, neff 421 · review | – | – | not run |
λ in W/(m K), Rb* in m K/W. Known values of the synthetic test: λ 2.60, Rb* 0.085. Beier: published λ 2.88; no recovery recorded, so M5 is not run. Recommended: synthetic M2 CHS (ΔBIC 172.4 over the ILS); Beier M2 ILS (the FLS fits slightly better, but not significantly).
Limits to keep in mind
- A TRT measures λ as the effective value over the test borehole’s active length. In layered ground BoreTherm can match one layer so that the effective value over that length is right; it cannot resolve the layers from one test.
- The choice of the borehole model (ILS or CHS) changes λ by several percent, more than the noise of a good test. Keep the recommended model unless you have a reason.
- The fit interval is optimistic. Use the Monte Carlo of the input errors (wizard step 5) for the uncertainty of λ and Rb*, and carry it into a Monte Carlo of the design.
- Groundwater flow, a bounded test domain or a drifting power all look like a λ that keeps rising. M3 is recommended only when it is identifiable and fits significantly better; the flow direction cannot be found from one borehole.
- Screening flags are heuristics. Keep the raw file, read the operating log, and exclude intervals only for a reason.
- Apply changes the design inputs, not the test: the report of the evaluation (wizard step 5, TRT report) is the evidence to keep with the design.
Numbers calculated with BoreTherm. Theory: BoreTherm theory manual (VDI 4640 Part 5, ISO 17628, ASHRAE). Beier data: Beier, Smith & Spitler (2011), Geothermics 40(1).