The one idea: the borehole is a small heat store
The 2D design (Calculation › Calculate and Calculation › Size borehole length, with the ground response from the g-function) treats the borehole as a resistance: the fluid is always R*b·q colder (or warmer) than the borehole wall (R*b the effective borehole resistance, q the heat rate per metre), and the heat the heat pump takes crosses the wall at the same instant. A real borehole holds fluid, pipe walls and grout. They store heat. When the load starts, the first heat comes from this store; when it stops, the ground refills it. Full transient boreholes model this store, and the fluid that needs time to travel down and up the pipes.
Ploop − Pwall = dEb/dtPloop = ṁcp(Tin − Tout)τ = max(Cb·R*b, 2 ttransit)Tf = (Tin + Tout)/2Heat rates are > 0 into the ground; Cb is the heat capacity per metre, ttransit the fluid’s time down and up. The time constant τ tells where the store matters. In the example, Cb = 37.4 kJ/(m·K) and R*b = 0.109 m·K/W give τ = 68 min. Load changes shorter than a few τ (hourly peaks, stops) look different; monthly loads hardly do.
The workflow
Full FEM is a check of a chosen design with the actual loads, not a replacement of the 2D design. Two questions decide the settings: do short load changes matter, and which results will you read?
In the program, Full FEM adds the group Input › Full FEM and the page Results › Full FEM results:
- Physics & run: Ground Simple or Fully coupled TH (with groundwater flow); Boreholes Steady-state or Full transient; Control Automatic (with transient boreholes: the heat rate of the fluid loop, i.e. the heat pump); Time stepping (initial step 1 h, smallest step 1 min, largest step 30 d, tolerance 0.01 K); initial state and thermal boundaries. Run full 3D simulation (also Calculation › Run 3D analysis); the line below estimates the run.
- Materials: λ and C per layer; by default the Ground page values, so the 3D run and the 2D design use the same ground (Check ✓).
- Transient boreholes: axial cell length (automatic 1 m), sub-steps per transit (automatic 40), the near-borehole model (radial sub-grid, recommended), the pipe-wall capacity (PE 1.8 MJ/(m³·K)), and the summary: capacities per metre, transit time, time constant.
How the calculation works
Full FEM computes no g-function. It steps the 3D ground mesh in time with the actual loads (backward Euler, an implicit time step) and, inside every ground step, the borehole columns in short sub-steps (multirate). Both meet at the end of each ground step, in one linear system.
- Step size. Steps are 60 s × 2k, at most 30 days. After every change of the input (load, flow, pump on / off) the step restarts at the largest rung not above the initial step: 1 h → 32 min. Every event is hit exactly.
- Borehole columns. One 1D column per string of the network: axial cells of about 1 m with the fluid of each leg and the grout nodes of the cross-section. After a change the sub-steps are transit / 40 for three transits, then they double. The column is linear, so the wall heat of the step is an affine function of the ring temperatures and Tin (unit responses, cached per step size, plus the response of the stored state).
- Loop control and solve. With Automatic = loop power, Tin follows in closed form so that the step-mean ṁcp(Tin − Tout) equals the load. Tin is constant within a ground step. The ground mesh and one ring unknown per borehole point are solved together.
- Step doubling. One step of Δt is compared with two of Δt/2. The error is the largest difference of the ground temperatures and the mean borehole wall temperature. Above the tolerance: reject and halve. At or below a quarter of it: the next step doubles.
- Outputs. Each accepted step adds to every output interval it overlaps (the load interval: an hour here). Means are time means; the lowest and highest values come from the borehole sub-steps.
The theory: what the borehole model adds
The borehole model has two parts (figure below). Inside the borehole, the column: fluid cells that pass the fluid on, and grout nodes that store heat. Near the wall, the ground mesh is too coarse for minutes and hours: an axis cell of about 0.7 m needs days before its node follows the true wall temperature. The radial sub-grid (30 cells from rb to two axis cells, held at the mesh temperature there) gives the short-time wall temperature. It adds no heat: the energy stays in the mesh. The steady well index of Simple FEM (a fixed resistance between the wall and the mesh node) remains selectable; it is 2–3 K off in the first hours.
How each result is derived
All values for the example, Full FEM with the default tolerance unless noted.
| Result | How BoreTherm derives it | Example |
|---|---|---|
| Heat capacity per metre Cb | fluid ρcp·Afluid + pipe walls 1.8 MJ/(m³K)·π(ro² − ri²) per leg + grout Cg·Agrout (the grout annulus without the pipes) | 4.3 + 0.95 + 32.1 = 37.4 kJ/(m·K) |
| Fluid transit time | fluid volume of the legs / flow | 10.78 cm² × 50 m / 0.4 l/s = 135 s (2.2 min) |
| Borehole time constant τ | max(Cb · R*b, 2 transits); also the control interval of the wall-power control | 37.4 kJ/(m·K) × 0.109 m·K/W = 68 min |
| First borehole sub-step | shortest transit / 40 (0.5 … 300 s), for 3 transits after a change; then doubling | 3.4 s |
| Loop power | ṁcp(Tin − Tout) = the load (control Automatic); Tin in closed form per ground step | −2.50 kW in hours 1–6 |
| Wall power | the heat the borehole columns pass into the ground mesh, step mean | −1.20 kW in hour 1, −2.33 kW in hour 6 |
| Heat from the borehole store | (loop power − wall power) × time | −1.30 kWh in hour 1 |
| Mean fluid temperature Tf | (Tin + Tout)/2 per step, time mean over the interval; pump off: the volume mean of the standing fluid | hour 1: (4.09 + 5.66)/2 = 4.88 °C |
| Tout − Tin | −Ploop / (ṁcp) | 2500 W / 1590 W/K = 1.57 K |
| Lowest / highest within the interval | extremes of Tf at the borehole sub-steps of every accepted step | hour 7: 2.58 °C (0.01 K), 1.23 °C (0.003 K) |
| Loop balance | Σ (Ploop − Pwall) Δt − ΔEb; zero to round-off | 1.5·10−5 J over the run |
| Design limits line | lowest and highest Tf of the run against the limits, next to the 2D design | 3D 0.03 °C, 2D 0.04 °C; limit −3 °C |
Limits to keep in mind
- Monthly design loads: transient boreholes change the design temperatures little (validation benchmark B9b: month-end values within 0.017 K of steady boreholes). Use them for hourly peaks, stops and inlet-temperature limits.
- Step tolerance: 0.01 K for monthly design values; 0.003 K or tighter for hourly values and the first interval after a load or pump stop. The tolerance controls the ground and wall temperatures, not the fluid directly.
- Control: keep Automatic (loop power) for heat-pump loads. Ground load at the borehole wall with transient boreholes holds Tin over at least the time constant (here 68 min) to stay stable; load intervals shorter than that are merged.
- Pump off: the fluid stands; a load requested while the pump is off is not delivered and is reported. After the end of a time series shorter than a year there is no load and the pump is off.
- Fluid: constant brine properties; freezing of the brine is not modelled (the freezing check reports the lowest inlet temperature, here −0.75 °C against −9.8 °C).
- Cost: every load change needs a new run, and sizing, Calculate and the studies stay 2D. Dense fields (fewer than 3 axis cells between boreholes) get a warning; use the BTES model (borehole thermal energy storage) there.
Numbers calculated with BoreTherm. Theory: BoreTherm theory manual; validation: benchmark B3 (converged within 0.09 K of the converged dynamic model).