The one idea: the borefield sees the heat pump, not the building
The Loads page holds building loads: the heat the building needs (space heating and domestic hot water, DHW) and the heat it must get rid of. The borefield never sees these numbers directly. It sees what the heat pump takes from the ground and puts back. The difference is the electricity of the compressor. How much electricity the heat pump needs is given by its COP (coefficient of performance: heat delivered / electricity, at one operating point) and, in cooling, by its EER (energy efficiency ratio: heat removed / electricity).
Qground = Qheat · (1 − 1/COP)Qground = Qcool · (1 + 1/EER)Qground = QcoolOver a season the COP becomes the seasonal performance factor SPF = heat delivered / electricity used (in BoreTherm including the electric backup and the source pump). With SPF 3.8, 1 − 1/3.8 = 74 % of the heat comes from the ground.
The workflow
There are two paths. Both end with a borefield that keeps the mean fluid temperature Tf (the mean of the inlet and outlet temperature of the fluid in the boreholes) inside the design limits; they differ in how well the heat pump is known. Both use the same two calculations: Calculation › Calculate, the design check at the current borehole length, and Calculation › Size borehole length, which finds the length that meets the limits.
In the program the heat pump has one home, Design › Heat pump, with three pages:
- Setup: How should heat-pump performance be calculated? — fixed seasonal efficiency or temperature-dependent performance — plus the SPFs, the cooling options and the heat pump model.
- Equipment selection: the design load basis, the requirement sheet and the candidate machines from their datasheets. Optional.
- Selection results: the requirement sheet, the check of every candidate and the coupled rerun of the design with each candidate.
Two ways to calculate
Fixed seasonal efficiency. Each load is multiplied by a constant ground factor, (SPF − 1)/SPF for heating and DHW and (SPF + 1)/SPF for active cooling. Quick and transparent, but the SPF is a guess and does not react when the field gets colder or warmer.
Temperature-dependent performance. The heat pump model (datasheet test points, a heating curve, capacity, minimum brine temperature, cooling EER; brine is the antifreeze fluid of the ground loop) gives the COP month by month from the actual fluid temperature. A colder field gives a lower COP, and the ground load changes with it. The SPFs on Setup are now only starting values.
The coupling loop
- Start. Pass 1 converts the loads with the SPFs on Setup.
- Simulate the borefield (with its g-function, the dimensionless temperature response of the field to a constant heat load; all years): monthly mean fluid temperature Tf.
- Operating point per month. Source = the brine leaving the field and entering the heat pump, Tout = Tf − Q/(2 ṁ cp) (Q > 0 = injection; during extraction the outlet is warmer than the mean; ṁ cp: mass flow × specific heat of the fluid). Sink = the flow temperature of the heating curve at that month’s outdoor temperature; domestic hot water at its own temperature (50 °C).
- Heat pump model. COP = η · COPCarnot, with COPCarnot = Tsink / (Tsink − Tsource + ΔTlift) in kelvin (ΔTlift: the temperature differences in the heat exchangers); the efficiency η is interpolated between the datasheet points. If the load exceeds the capacity, or the brine is below the machine’s minimum inlet temperature, an electric backup heater (COP 1) covers the rest. Backup heat takes nothing from the ground.
- New ground factors per month: share · (1 − 1/COP), where share is the part the heat pump covers. Active cooling: 1 + 1/EER. Passive cooling only while the fluid stays below the passive limit, otherwise active.
- Converged when the SPF and every monthly factor change by less than 0.01. At most 5 passes; if not converged, a warning says so.
Why the COP matters twice
* Annual sum of the monthly net ground loads, as Selection results reports it (months with both heating and cooling are netted).
The effect also works the other way round and limits itself: a colder field lowers the COP, which lowers the share from the ground. The coupling loop finds the balance.
Choosing a machine: Equipment selection
The requirement sheet is calculated from the design itself, with no candidate. It is the spec a brine/water heat pump must meet for this borefield:
| Requirement | How BoreTherm derives it | Example |
|---|---|---|
| Heating capacity at the design point | (design heat load + DHW surcharge) × lock-out factor 24 / (24 − lock-out h); lock-out h: hours per day without power to the heat pump | (100.0 + 2.7) × 1.00 = 102.7 kW |
| … at the catalogue point B0/W35 | the same, converted with the capacity curve of the heat pump model (B0/W35: brine 0 °C, heating water 35 °C) | 105.4 kW |
| Design point | outdoor design temperature; brine = lowest field outlet temperature; flow = heating curve | −12 °C / −1.3 °C / 35 °C, COP 4.31 |
| Lowest brine inlet the machine must accept | Tf,min − margin (2 K) | −2.41 − 2 = −4.4 °C |
| Highest brine inlet | Tf,max + margin (2 K) | 18.0 °C |
| Brine flow and pump head | flow of the field; head = field + header pressure drop (+ the evaporator of each candidate) | 8.0 l/s, 190 kPa |
| Active cooling capacity and EER | cooling peak; EER ≥ cooling SPF on Setup (temperature-dependent mode: the model’s EER) | 45 kW, EER ≥ 5.0 |
The check compares every line with each candidate’s datasheet and gives a status: Met with a margin of at least 10 % (capacities) or 1 K (temperatures), Tight with a smaller margin, Not met below the requirement. Then the design is simulated again with each candidate as the project’s heat pump (the coupled rerun): the candidate must also keep the fluid temperature inside the design limits. The worst line decides the overall status.
Use in the project copies the candidate’s datasheet into the project’s heat pump model (capacity × units, minimum brine temperature, modulation, cooling EER) and switches Setup to temperature-dependent performance. It does not change the borehole length and marks all results out of date. Run Calculate and Size borehole length afterwards, then check again.
The example in numbers
| State | SPF heating | Net ground extraction [MWh/a] | Tf,min | Limit −3 °C |
|---|---|---|---|---|
| Fixed SPF 3.8 / 2.8 / 5.0, 150 m | 3.8 (input) | 143.1 | −2.41 °C | within −3 °C |
| Beta in the project, 150 m (Calculate) | 4.80 (calculated) | 160.5 (+12 %) | −3.84 °C | below the limit |
| Beta in the project, sized: 160.0 m (Size borehole length) | 4.82 (calculated) | 161.1 | −3.00 °C | at the limit |
Requirements at 150 m: 102.7 kW at the design point, brine down to −4.4 °C. Beta 60 × 2 meets every line of the sheet but not the design limits of the 150 m field. After sizing to 160.0 m it meets all requirements (EER only tight, because in the temperature-dependent mode the required EER is Beta’s own).
Limits to keep in mind
- With monthly loads the COP is evaluated per month; part-load lines (operating hours, starts) are estimates. Hourly loads give the real profile.
- The SPF and the cooling SEER (seasonal EER: cold / electricity over the year) include the source pump electricity. With a large field pump the SEER can be far below the EER of the machine (the example: SEER 2.84 with EER 5.6).
- With ground loads on the Loads page, or time-series loads, there is nothing to convert: the heat pump settings do not apply.
- Equipment selection is a preliminary check against datasheet values you enter; BoreTherm has no product database. Check the manufacturer’s data, envelope, hydraulics and controls.
Numbers calculated with BoreTherm. The datasheets of the candidates are fictitious.