What the example does
The office loads are entered in four ways: monthly energies with peak loads (the reference), an hourly profile generated from the monthly values, a demand that grows from year to year, and a fluid-side time series of a smaller 3 × 3 field. The example shows how the load description changes the design temperatures.
Inputs
| Input | Value |
|---|---|
| Field | 16 boreholes, 4 × 4 rectangle, spacing 6.0 × 6.0 m |
| Boreholes | length 150.0 m, top 4.0 m below the surface, diameter 140 mm |
| Construction | single U, PE pipe 32 × 2.9 mm, shank spacing 70 mm, grout 1.60 W/(m·K) |
| Ground | thermal conductivity 2.60 W/(m·K), heat capacity 2.20 MJ/(m³·K), surface temperature 9.0 °C, geothermal heat flux 0.060 W/m² |
| Fluid and flow | 25 % monopropylene glycol, 0.50 l/s per borehole |
| Loads | monthly: heating 200 MWh, hot water 8 MWh and cooling 45 MWh per year; peaks 100 kW heating and 45 kW cooling for 6 h |
| Heat pump | seasonal performance factors 3.8 heating, 2.8 hot water, 5.0 cooling |
| Design limits | mean fluid temperature between −3.0 °C and 20.0 °C |
| Period | 25 years |
| Variants | monthly energies and peaks; generated hourly profile; growth of the heating demand from year to year; fluid-side hourly time series (3 × 3 field, 120 m) |
Run the example in BoreTherm
- Open Design → Loads. Enter monthly energies and peak loads, or use Annual total + profile to spread an annual demand over the months.
- Generate hourly loads builds an hourly office profile from the monthly values and a weather series; Growth / decline changes the demand year by year.
- Press Calculate and compare the temperature curves on Results → Mean fluid temperature and Results → Hourly temperatures.
From building loads to ground loads
- Building loadsHeating, hot water and cooling of the building, per month, with the peak load and its duration (6 h).
- Heat pumpThe seasonal performance factors (3.8 heating, 2.8 hot water, 5.0 cooling) convert them into ground loads: in heating the compressor work is not taken from the ground, in cooling it is added to it.
- Ground loadsThe ground supplies 153 MWh and receives 54 MWh a year: a net extraction of 99 MWh that cools the ground year after year.
- Time stepsMonthly: the month's mean load plus a peak pulse at its end. Hourly: every hour, superposed quickly with a Fourier transform (FFT).
- Yearly profileThe year is repeated for the design period, or scaled by a growth factor.
- SuperpositionEvery load change is a step on the g-function; their sum gives the fluid temperature.
The example in BoreTherm
Calculated results
Calculated with BoreTherm for every variant of the example. Displayed values are rounded.
Temperatures by variant
| Variant | Boreholes | Length H [m] | Tf min [°C] | Tf max [°C] | Rb* [m K/W] | Pump [W] | Design limits |
|---|---|---|---|---|---|---|---|
| monthly energies and peaks | 16 | 150.000 | -2.413 | 16.026 | 0.1194 | 3,033.2 | within limits |
| generated hourly profile | 16 | 150.000 | -3.064 | 16.068 | 0.1194 | 3,033.2 | limits exceeded |
| fluid-side time series (3 × 3) | 9 | 120.000 | -0.130 | 22.416 | 0.1033 | 357.7 | limits exceeded |
| growing demand | 16 | 150.000 | -9.458 | 16.026 | 0.1194 | 3,033.2 | limits exceeded |
What the example shows
The hourly profile reaches a colder minimum (−3.06 °C) than the monthly method (−2.41 °C): its cold spells last longer than the 6-hour peak of the monthly description. A demand that grows every year cools the ground further and ends far below the limit (−9.46 °C).
The generated weather and schedules are synthetic. For a real building, use hourly loads from a building simulation where they exist.