HomeFeaturesExamplesTutorialsHelpTheoryVerificationPricingContact
BoreTherm / Example libraryExample 08 / 23
Worked feature example

Automatic sizing

Find the active borehole length required for the office field. Compare uniform lengths with an unequal-length field and preserve the sizing iteration trace.

16Boreholes
-2.41 °CMinimum mean fluid temperature
16.03 °CMaximum mean fluid temperature
3Variants compared
01 / Project

What the example does

BoreTherm finds the borehole length at which the office field just meets its temperature limits. The example sizes the uniform 4 × 4 field and a field with unequal lengths.

Inputs

InputValue
Field16 boreholes, 4 × 4 rectangle, spacing 6.0 × 6.0 m
Boreholeslength 150.0 m, top 4.0 m below the surface, diameter 140 mm
Constructionsingle U, PE pipe 32 × 2.9 mm, shank spacing 70 mm, grout 1.60 W/(m·K)
Groundthermal conductivity 2.60 W/(m·K), heat capacity 2.20 MJ/(m³·K), surface temperature 9.0 °C, geothermal heat flux 0.060 W/m²
Fluid and flow25 % monopropylene glycol, 0.50 l/s per borehole
Loadsmonthly: heating 200 MWh, hot water 8 MWh and cooling 45 MWh per year; peaks 100 kW heating and 45 kW cooling for 6 h
Heat pumpseasonal performance factors 3.8 heating, 2.8 hot water, 5.0 cooling
Design limitsmean fluid temperature between −3.0 °C and 20.0 °C
Period25 years
Sizing range20 to 300 m per borehole, tolerance 0.1 m
Variantsuniform lengths; unequal lengths (edges longer than the centre)

Run the example in BoreTherm

  1. Open Design → Design limits & simulation and check the limits and the sizing range.
  2. Press Size borehole length.
  3. Results → Required borehole length shows the length, the limiting temperature and the temperatures against the length.
  4. Apply length to project takes the result into the design.
02 / How BoreTherm calculates it

How Size borehole length finds the length

1 g-functionsexact at 5 lengthsbetween 20 and 300 m2 Bracketlimits not met at 20 m,met at 300 m3 Brent's methodon the interpolatedg-function → H ≈ 143.6 m4 Exact checksimulate with the exactg-function at the rootTfMin = −3 °Cwithin 0.1 m?5 Newton stepsecant throughthe exact pointsnonext exact runyes → H = 143.72 m, 2,299 m in total, limited by TfMin12 evaluations in total, 2 of them with the exact g-function.
The search for the office field: interpolated g-functions first, then exact confirmation.
  1. g-functionsCalculating a g-function is the expensive part, so BoreTherm calculates it exactly at five lengths and interpolates between them.
  2. BracketAt 20 m the limits are not met, at 300 m they are: the answer lies between.
  3. Brent's methodThe root of 'lowest temperature minus limit' is found on the interpolated g-function, with the ground temperature and Rb* recomputed for every length.
  4. Exact checkThe design is simulated again with the exact g-function at the root.
  5. Newton stepIf the exact result is not within the tolerance, a secant step through the exact points gives the next length.
03 / In BoreTherm

The example in BoreTherm

Results → Required borehole length: 143.7 m per borehole, limited by the minimum temperature.
Results → Required borehole length: 143.7 m per borehole, limited by the minimum temperature.
04 / Results

Calculated results

Calculated with BoreTherm for every variant of the example. Displayed values are rounded.

VariantRequired mean H [m]Total [m]Tf min [°C]Tf max [°C]Binding limitIterations
uniform 150 m (input)143.7182,299.484-2.99816.178minimum temperature12
unequal lengths143.2822,292.519-2.99816.195minimum temperature12
Automatic sizing results plotted from BoreTherm output
Chart of the BoreTherm results in the tables of this section.

Temperatures by variant

VariantBoreholesLength H [m]Tf min [°C]Tf max [°C]Rb* [m K/W]Pump [W]Design limits
uniform 150 m (input)16150.000-2.41316.0260.11943,033.2within limits
uniform, sized16143.718-2.99816.1780.11902,906.2within limits
unequal lengths16146.250-2.71516.1200.11923,033.2within limits
05 / Discussion

What the example shows

The uniform field needs 143.72 m per borehole (2,299 m in total), 4 % less than the 150 m of the input. The minimum temperature limit is binding; the maximum stays at 16.2 °C. With unequal lengths the field needs 143.28 m on average: longer boreholes at the edge, where the ground is less disturbed, help slightly.

Sizing never changes the limits or the search range. The result is a proposal until it is applied to the project.