TRT evaluation

Evaluate a synthetic 72-hour thermal response test with a deliberate generator interruption, compare fit methods and apply the recommended ground parameters to a saved design copy.

16Boreholes
-3.43 °CMinimum mean fluid temperature
16.80 °CMaximum mean fluid temperature
3Variants compared
01 / Project

What the example does

A thermal response test of 72 hours on one borehole of the office field, with a deliberate interruption of the heater. BoreTherm screens the data, fits the ground conductivity and the borehole resistance with several methods and applies the recommended fit to the design.

Inputs

InputValue
Field16 boreholes, 4 × 4 rectangle, spacing 6.0 × 6.0 m
Boreholeslength 150.0 m, top 4.0 m below the surface, diameter 140 mm
Constructionsingle U, PE pipe 32 × 2.9 mm, shank spacing 70 mm, grout 1.60 W/(m·K)
Groundthermal conductivity 2.20 W/(m·K), heat capacity 2.20 MJ/(m³·K), surface temperature 9.0 °C, geothermal heat flux 0.060 W/m²
Fluid and flow25 % monopropylene glycol, 0.50 l/s per borehole
Loadsmonthly: heating 200 MWh, hot water 8 MWh and cooling 45 MWh per year; peaks 100 kW heating and 45 kW cooling for 6 h
Heat pumpseasonal performance factors 3.8 heating, 2.8 hot water, 5.0 cooling
Design limitsmean fluid temperature between −3.0 °C and 20.0 °C
Period25 years
Test72 h heating, about 5.9 kW, 0.5 l/s, samples every 2 min; one interruption

Run the example in BoreTherm

  1. Open Advanced analysis → TRT evaluation and start the wizard.
  2. Import the measured series and check the test setup (borehole, fluid, flow).
  3. Read the quality checks, then evaluate: line source, cylinder source and superposition methods.
  4. Compare the fits and apply the recommended one to the ground and Rb* of the project.
02 / How BoreTherm calculates it

How a response test is evaluated

1 Importtime, inlet and outlet T,flow, power2 Quality checksduration, power stability,spikes, gaps, interruptions3 Heat historyq(t) per metre from flowand temperature difference4 FitTf(t) = T0 + q R(t) withline / cylinder source5 Recommendbest fit over the validperiod → λ, Rb*, T06 Applywrite λ and Rb* intothe designFit: λ 2.60 W/(m·K), Rb* 0.085 m·K/W, T0 11.3 °C
The wizard's steps for the synthetic test.
  1. ImportThe measured series is read from a file.
  2. Quality checksFifteen checks against recommended limits. Two fail here: the heating power varies too much because of the interruption.
  3. Heat historyThe injected heat per metre is calculated from flow and temperature difference.
  4. FitThe classical line-source slope is only valid without interruptions; the superposition methods use the whole heat history, including the interruption.
  5. RecommendThe cylinder source with superposition fits best.
  6. ApplyThe design is recalculated with the fitted ground.
03 / In BoreTherm

The example in BoreTherm

The quality checks of the test: the interruption is detected.
The quality checks of the test: the interruption is detected.
The evaluation: fitted temperature curves of the methods.
The evaluation: fitted temperature curves of the methods.
Applying the recommended fit to the project.
Applying the recommended fit to the project.
04 / Results

Calculated results

Calculated with BoreTherm for every variant of the example. Displayed values are rounded.

TestRecommended fitλ [W/(m K)]Rb* [m K/W]T0 [°C]Quality passed
synthetic office testsuperposition-chs2.5990.0849611.300No
measured sandbox testsuperposition-ils2.8310.1547622.090Yes

Synthetic test quality checks

CheckDesign limitsValueLimitUnitFinding
Sampling interval (longest)pass2.00010.000minlongest sampling interval 2.0 min
Temperature spike screening coveragepass2,907.0001.000samples2907 samples screened; at least five finite readings in a symmetric window are needed; endpoints are untested
Flow and power disturbanceswarning2.0000.000events2 operating event(s); raw readings and heat history preserved; review exclusions
Test duration (heating)pass72.00048.000h72.0 h of heating
Heating power: standard deviation / meanfail14.6061.500%14.61 % of the mean power 5878 W (600 s averages)
Heating power: largest deviation / meanfail100.80310.000%100.8 % of the mean power
Specific heat ratepass39.17980.000W/m39.2 W/m (recommended 30 to 80 W/m)
Flow: standard deviation / meanpass0.0005.000%0.00 % of the mean flow 0.500 l/s
Reynolds number (turbulent flow recommended)pass19,121.3452,300.000Re = 19121
Time between grouting and testpass7.0005.000d7.0 days
Undisturbed temperature against Ts + q_geo (D + H/2) / lambdapass-0.1262.000KT0 = 11.30 degC, expected 11.43 degC
Energy balance: measured power against rho cp V dTpass-0.01310.000%measured 5877 W, from flow and dT 5878 W
Data gaps (longest)pass0.00060.000minno gaps
Heating interruptionswarning1.0000.0001 interruption(s): the line-source slope (M1) is not valid across them; the superposition methods account for them
Spikes removed (Hampel filter)pass2.00029.1102 sample(s) removed (0.07 %)
TRT evaluation results plotted from BoreTherm output
Chart of the BoreTherm results in the tables of this section.

Temperatures by variant

VariantBoreholesLength H [m]Tf min [°C]Tf max [°C]Rb* [m K/W]Pump [W]Design limits
office, with the fitted ground16150.000-0.79015.8210.08503,033.2within limits
office, before the test (λ 2.2)16150.000-3.43416.7990.11963,033.2limits exceeded
sandbox borehole118.30015.78926.6520.202518.7limits exceeded
05 / Discussion

What the example shows

The fit gives λ = 2.60 W/(m·K) and Rb* = 0.085 m·K/W, against the 2.2 W/(m·K) assumed before the test. With the measured values the office field meets its limits (−0.79 °C instead of −3.43 °C).

Two quality checks fail because of the deliberate interruption. A fitted value is available, but the failed checks are part of the record: such a test should be reviewed before its result is used.