Thermal plume analysis

Map the office field temperature change on the site plan. Export signed threshold extents and clearances at the end of the design period, and compare a uniform groundwater-flow case.

16Boreholes
-1.13 °CMinimum mean fluid temperature
16.42 °CMaximum mean fluid temperature
2Variants compared
01 / Project

What the example does

How far does the cooled ground around the office field reach after 25 years, and does it cross the plot boundary? BoreTherm maps the temperature change on the site plan, measures the −3 K and +3 K regions and their clearances to the plot, and repeats it with groundwater flow.

Inputs

InputValue
Field16 boreholes, free positions
Boreholeslength 150.0 m, top 4.0 m below the surface, diameter 140 mm
Constructionsingle U, PE pipe 32 × 2.9 mm, shank spacing 70 mm, grout 1.60 W/(m·K)
Groundthermal conductivity 2.60 W/(m·K), heat capacity 2.20 MJ/(m³·K), surface temperature 9.0 °C, geothermal heat flux 0.060 W/m²
Fluid and flow25 % monopropylene glycol, 0.50 l/s per borehole
Loadsmonthly: heating 200 MWh, hot water 8 MWh and cooling 45 MWh per year; peaks 100 kW heating and 45 kW cooling for 6 h
Heat pumpseasonal performance factors 3.8 heating, 2.8 hot water, 5.0 cooling
Design limitsmean fluid temperature between −3.0 °C and 20.0 °C
Period25 years
Plumethresholds −3 K and +3 K at the end of the design period; plot boundary as evaluation object
Variantsno groundwater; groundwater flow

Run the example in BoreTherm

  1. Press Calculate, then open Results → Thermal plume.
  2. Choose the depth, the time and the thresholds; the map shows the temperature change on the site plan.
  3. The tabs Extents and Clearances list the area, the reach and the distance of every threshold region to the site objects.
02 / How BoreTherm calculates it

How the plume is calculated

1 Base loadsmonthly ground loads(no short peaks)2 Point responsefinite line source at everymap point from every borehole3 Superpositionload history over 25 years→ ΔT on the map4 Thresholdscontours at −3 K and +3 K→ area, reach5 Clearancessigned distance of eachregion to the plot−3 K region: 1,551 m², crosses the plot by 8.4 m
The plume uses the field's monthly base loads.
  1. Base loadsShort peaks do not reach far into the ground and are left out.
  2. Point responseEach map point gets the temperature change caused by every borehole.
  3. SuperpositionThe load history is superposed as in the design calculation.
  4. ThresholdsThe regions colder than −3 K (or warmer than +3 K) are traced on the map.
  5. ClearancesA negative clearance means that the region crosses the object.
03 / In BoreTherm

The example in BoreTherm

Results → Thermal plume: the temperature change on the site plan.
Results → Thermal plume: the temperature change on the site plan.
Clearances of the threshold regions to the site objects.
Clearances of the threshold regions to the site objects.
04 / Results

Calculated results

Calculated with BoreTherm for every variant of the example. Displayed values are rounded.

VariantThreshold [K]Area [m²]Reach [m]Downstream [m]Clearance
no groundwater-3.0001,550.6749.928—PLOT: -8.428 m
no groundwater3.0000.0000.000—PLOT: — m
groundwater flow-3.00064.2212.2772.228PLOT: 0.747 m
groundwater flow3.0000.0000.000—PLOT: — m
Thermal plume analysis results plotted from BoreTherm output
Chart of the BoreTherm results in the tables of this section.

Temperatures by variant

VariantBoreholesLength H [m]Tf min [°C]Tf max [°C]Rb* [m K/W]Pump [W]Design limits
no groundwater16150.000-1.13016.4160.11943,033.2within limits
groundwater flow16150.0000.41916.4230.11943,033.2within limits
05 / Discussion

What the example shows

Without groundwater the −3 K region covers 1,551 m² and crosses the plot boundary by 8.4 m. With groundwater it shrinks to 64 m² and stays inside the plot, but it is carried 2.2 m downstream. The +3 K threshold is never reached: the building extracts more heat than it returns.

A threshold crossing is a calculated result under the stated loads and ground. Whether it matters is a question for the permit authority.