Source, inputs and purpose
Source. Kavanaugh, S. and Rafferty, K. (2014). Geothermal Heating and Cooling: Design of Ground-Source Heat Pump Systems. ASHRAE, Atlanta. Example 3.3, pp. 71–73; design equations of §3.2, pp. 53–56; heat pump data from Table 2.4, p. 30.
Inputs and reference results are taken from the cited publication; BoreTherm results were calculated with BoreTherm on the project rebuilt from those inputs; differences are explained below.
What the example checks
The example sizes a borehole field for a building whose heating load sets the length. It compares BoreTherm’s g-function sizing of the real 5 × 4 field with the ASHRAE design equation, which uses a cylinder source and a tabulated long-term temperature penalty. As an addition that the book does not make, BoreTherm checks three water-to-water units from Table 2.4 against the sized field.
Inputs
Values marked Assumption are not given in the book and were chosen for the BoreTherm project; the others are the book’s, with the section or page.
| Input | Value | Source |
|---|---|---|
| Building block loads | 90 kW heating, 75 kW cooling | Ex. 3.3 |
| Equivalent full-load hours | 900 h heating, 450 h cooling | Ex. 3.3 |
| January part-load factor | 0.31 | Ex. 3.3 |
| Heat pump efficiency (fixed) | COPh 3.5, COPc 4.8 | Ex. 3.3 |
| Field | 5 × 4 boreholes at 6 m spacing, 125 mm diameter | Ex. 3.3 |
| Borehole | single U 32 mm DR 11, grout 1.4 W/(m·K) | Ex. 3.3 |
| Ground | 2.0 W/(m·K), diffusivity 0.08 m²/day (2.16 MJ/(m³·K)), 8 °C | Ex. 3.3 |
| Borehole resistance | 0.135 m·K/W, imposed as Rb* | Ex. 3.3 |
| Fluid and flow | 20 % propylene glycol, 310 L/min in total | Ex. 3.3 |
| Design period and peaks | 20 years, 4 h peaks | Ex. 3.3 |
| Length per borehole in the project | 105.5 m (the book’s 2,110 m over 20 boreholes) | p. 73 |
| Sizing criterion | mean fluid temperature ≥ −1.5 °C (mean of the entering 0 °C and leaving −3 °C) | Assumption |
| Monthly loads | January 20.76 MWh, other months by an Ottawa degree-day shape; cooling 33.75 MWh/a, May to September | Assumption |
| Peak months | 90 kW heating in January, 75 kW cooling in July | Assumption |
| Heat pump candidates | model 360 (87.0 kW), 2 × model 210 (101.4 kW), 2 × model 180 (89.6 kW) at an entering source of 0 °C | Table 2.4, p. 30 |
| Candidate rating sink | 44 °C leaving (ISO 13256-2 rates at 40 °C entering) | Assumption |
Run the example in BoreTherm
- Open the Ottawa reference project from the examples folder of the installation (File → Open).
- Press Size borehole length and open Results → Required borehole length.
- Open Design → Heat pump → Selection results and click Check candidates.
Two ways to the length
- Same loadsBoth start from the 90 kW heating block load and the equivalent full-load hours.
- Ground responseThe book uses the cylinder source for three pulses; BoreTherm the g-function of the 20 boreholes.
- Long-term interferenceThe book reads −0.5 K from a table; BoreTherm calculates it.
- LengthBoth find the length that keeps the fluid at the criterion.
The example in BoreTherm
Calculated results
Displayed values are rounded. Differences are BoreTherm relative to the book unless stated otherwise.
| Quantity | Book | BoreTherm | Difference |
|---|---|---|---|
| Required total length, heating limited | 2,110 m | 2,165 m (20 × 108.2 m) | +2.6 % |
| Same, BoreTherm’s classic-method sizing options | 2,110 m | 2,151 m (20 × 107.6 m) | +2.0 % |
| Mean fluid temperature at the book’s 105.5 m | criterion −1.5 °C | minimum −1.74 °C, maximum 18.62 °C | 0.24 K below the criterion |
Heat pump candidates
This check is BoreTherm’s addition; the example itself selects no unit. Requirement: 90 kW at the lowest field outlet temperature, −0.19 °C.
| Candidate | Book capacity at 0 °C (Table 2.4) | BoreTherm capacity line | BoreTherm overall |
|---|---|---|---|
| Model 360 | 87.0 kW | −3.3 %, not met | Not met |
| Model 210 × 2 | 101.4 kW | +12.7 %, met | Tight |
| Model 180 × 2 | 89.6 kW | −0.4 %, not met | Not met |
Why the results differ
Why the lengths differ
The book sizes with the ASHRAE equation: a cylinder source with three load pulses (20 years, one month, 4 hours), a short-circuit factor and a long-term penalty of −0.5 K read from a table for the field’s spacing. BoreTherm superposes the monthly loads and the peaks on the g-function of the actual 5 × 4 field, so the long-term interference between the boreholes is calculated rather than assumed. At the book’s 105.5 m, BoreTherm’s minimum mean fluid temperature is −1.74 °C, 0.24 K below the criterion, so it asks for 2.6 % more length. Neither the short-circuit factor nor the tabulated penalty is a BoreTherm input; the book’s borehole resistance is imposed as Rb*.
A note on the book’s numbers
The book divides its 2,110 m by 25 boreholes (84 m each), but the stated field has 5 × 4 = 20. The project uses 105.5 m per borehole, which is the book’s total over 20 boreholes.
Heat pump candidates
The capacity margins follow directly from the catalogue values and the 90 kW requirement, so they agree with a hand calculation. The pair of model 210 units meets the capacity requirement but is rated Tight overall for three reasons: its cooling EER (5.0) is only 4.2 % above the 4.8 the ground loads were calculated with; the design source temperature lies 0.19 K below its lowest rating point, so the capacity is extrapolated; and its smallest stage, one unit of 50.7 kW, is above half of the 90 kW peak in a mostly part-load profile. The pair of model 180 units misses the capacity by 0.4 % and the EER by 4.2 %. The flows of Table 2.4 are rating flows, so they are not entered as minimum brine flows.
BoreTherm features exercised
- Automatic sizing
- Monthly loads and peaks
- Heat carrier fluids
- Heat pump selection: requirement sheet, candidate check with identical units, coupled rerun