Source, inputs and purpose
Source. Laloui, L. and Rotta Loria, A.F. (2020). Analysis and Design of Energy Geostructures. Academic Press. Chapter 14, problem 14.xx: statement pp. 910–913, solution pp. 926–931.
Inputs and reference results are taken from the cited publication; BoreTherm results were calculated with BoreTherm on the project rebuilt from those inputs; differences are explained below.
What the example checks
A short, wide heat exchanger: an energy pile with an aspect ratio of 24. The comparison checks how the finite length of the pile changes the temperature after a season, compared with the infinite line and cylinder sources used in preliminary energy pile design.
Inputs
Values marked Assumption are not given in the book and were chosen for the BoreTherm project; the others are the book’s, with the section or page.
| Input | Value | Source |
|---|---|---|
| Pile | 0.8 m diameter, 19.2 m mean length (one of 162 piles) | pp. 910–913 |
| Ground (response test) | T0 11 °C, 1.5 W/(m·K), diffusivity 6.4 × 10⁻⁷ m²/s (2.34 MJ/(m³·K)) | pp. 910–913 |
| Pile resistance | 0.11 m·K/W, imposed as Rb* | p. 928 |
| Criterion | soil at least 1 °C, a fluid temperature change of at least −10 K | p. 912 |
| Design extraction rate | −25.3 W/m for eight months of 29.5 days | p. 929 |
| Load in the project | −25.3 W/m × 19.2 m = 485.8 W of direct ground load, hourly, for 5,664 h, then no load; 1 year | from p. 929 |
| Pile head and boundary condition | at the ground surface; uniform heat transfer rate set explicitly; cylindrical correction on | Assumption |
| Pipes, concrete, fluid | double U 32 × 2.9 mm, concrete 1.8 W/(m·K), 25 % propylene glycol at 12 L/min (no effect with the imposed resistance) | Assumption |
| Not modelled | the pile group (spacing not given), the soil layers and the groundwater flow (the book does not use them either) | Assumption |
Run the example in BoreTherm
- Open the energy pile reference project from the examples folder (File → Open).
- Press Calculate and open Results → Hourly temperatures.
- For other extraction rates, scale the heating load on the Loads page (or with
--set loads.heatingScaleon the command line).
Finite pile against infinite sources
- Same load−25.3 W/m over 19.2 m for eight months.
- Ground responseThe infinite sources ignore the pile's ends; the finite line source includes them (about 11 % less after eight months).
- Pile radiusThe cylindrical correction accounts for the 0.8 m diameter.
- FluidThe resistance term qR′ is added in both.
The example in BoreTherm
Calculated results
Displayed values are rounded. Differences are BoreTherm relative to the book unless stated otherwise.
Change of the mean fluid temperature at the end of the load period. Book: infinite line source plus qR′ / cylinder source.
| Quantity | Book | BoreTherm | Difference |
|---|---|---|---|
| −25.3 W/m for 8 months (design rate) | −9.8 / −10.0 K | −9.05 K | 0.75 / 0.95 K milder |
| −30 W/m for 8 months | −11.6 / −11.8 K | −10.73 K | 0.87 / 1.07 K milder |
| +30 W/m for 4 months | +10.5 / +10.8 K | +9.97 K | 0.53 / 0.83 K milder |
| −21.3 W/m for 8 months (final design) | −8.4 / −8.4 K | −7.62 K | 0.78 K milder |
Why the results differ
Why BoreTherm is milder
The book treats every pile as an isolated infinite line or cylinder source. A 19.2 m pile is short compared with the distance heat travels in eight months, so heat also flows around its ends; after eight months the finite line source is about 11 % below the infinite one. BoreTherm’s result equals the finite line source plus the cylinder correction plus qR′, which an independent calculation reproduces (−9.05 K). The design criterion is met with 0.95 K to spare.
Boundary condition
For a pile whose head is at the ground surface, the project sets the uniform heat transfer rate condition explicitly. With BoreTherm’s default uniform borehole wall temperature, this short pile gives −7.78 K, a milder and therefore non-conservative value.
Notes on the book’s numbers
- The statement gives a 6 kW heat pump, but the solution calculates with 60 kW (p. 926).
- The book’s cylinder values labelled as rigorous are 0.15–0.2 K more extreme than its own cylinder source plus qR′.
What is not modelled
A pile group would be colder: after eight months the thermal reach is about 7 m, and the pile spacing is not given. Like the book, the project ignores the soil layers and the groundwater flow of 0.2 m/day.