8.1 Monthly base loads
The simulation covers months ( = 1 … 100 years). Month ends at and has the heat rate per metre of calendar month :
where is the start month (0 = January). Temporal superposition of (3.6) with from Chapter 4 gives the wall temperature and the mean fluid temperature at the end of each month (Hellström & Sanner 1994):
The classic monthly method prints calendar months with no load before the start month; BoreTherm's results start at the first operating month. The two agree after the index shift . The monthly method of an open-source sizing tool is the same algorithm; given the same g-values it agrees with an independent implementation of (8.2)–(8.3) to K.
8.2 Peak loads
The peak of month is a rectangular pulse of duration at the end of the month that replaces the base heat rate; its energy is not added to the monthly balance, as in the classic monthly conventions. Its effect is the step from to during :
The peak is applied only if it is more extreme than the base in its direction: for extraction and , for injection and ; otherwise . The peak response is an option:
- Field g-function (default, as in an open-source sizing tool): of the field, interpolated with (4.3); the time grid (4.24) always reaches below the shortest peak.
- Asymptote (the classic monthly method): Eskilson's single-borehole asymptote (4.21), clamped at zero (the clamp acts only for , about half an hour):
The use of (8.5) in the classic monthly method was established by back-calculation from the worked example of its published manual (residual ≤ 0.0024 in g over ten peak months). and are the mean length and radius of the field. The two choices differ by 0.03–0.08 K in the verification cases and by at most 0.04 K on the peaks of the Linden worked example. For the example the overall minimum at 150 m moves from −2.41 to −2.39 °C. The option applies to monthly simulations only; in hourly mode the peaks are real hours of the load series.
The annual extremes and the overall extremes used by sizing are
For the example in January of year 1: the base rate is = −13.28 W/m and the peak −30.70 W/m. With = 1.253 and = 0.1194 m K/W, (8.4) lowers the fluid temperature by 3.42 K, from 6.18 to 2.77 °C. With the asymptote (8.5) the drop would be 3.39 K.
| Month | base [W/m] | peak ext. [W/m] | peak inj. [W/m] | [°C] | [°C] | [°C] |
|---|---|---|---|---|---|---|
| Jan | −13.28 | −30.70 | – | 6.18 | 2.77 | 6.18 |
| Feb | −12.69 | −29.32 | – | 5.98 | 2.72 | 5.98 |
| Mar | −10.76 | −24.75 | – | 6.31 | 3.57 | 6.31 |
| Apr | −7.80 | −19.62 | 1.40 | 7.08 | 4.76 | 8.88 |
| May | −3.32 | −12.68 | 4.20 | 8.46 | 6.63 | 9.94 |
| Jun | 5.92 | – | 11.25 | 11.62 | 11.62 | 12.67 |
| Jul | 12.08 | – | 22.50 | 13.98 | 13.98 | 16.03 |
| Aug | 7.46 | – | 14.05 | 12.81 | 12.81 | 14.10 |
| Sep | −3.83 | −12.10 | 2.80 | 9.16 | 7.54 | 10.46 |
| Oct | −7.56 | −17.22 | – | 7.75 | 5.86 | 7.75 |
| Nov | −10.09 | −23.18 | – | 6.67 | 4.10 | 6.67 |
| Dec | −12.36 | −28.52 | – | 5.63 | 2.46 | 5.63 |
8.3 Hourly simulation
In hourly mode the heat rate is constant within each hour. The wall temperature at the end of hour is the discrete convolution of the load steps with the hourly step response:
Index is the end of hour and uses the load of that hour (the convention of the hourly method of an open-source sizing tool). The sum is evaluated in one of two ways, selected by an option.
8.3.1 FFT convolution
The first terms of the linear convolution are computed with real FFTs (Marcotte & Pasquier 2008), zero-padded to a length whose prime factors are all in {2, 3, 5, 7}, so that the circular convolution equals the linear one:
The cost is and the result is exact to round-off: 100 years (876 000 hours) take about 0.1 s.
8.3.2 Claesson–Javed load aggregation
Alternatively the past loads are aggregated into cells (Claesson & Javed 2012). Cell is hours wide (five cells per level) and ends hours in the past. Cells cover the requested horizon plus five margin cells. After each hour the cell loads shift from the oldest cell down; the last cell absorbs incoming history without losing an outflow,
and the temperature change is
For a 25-year hourly simulation of the example project the two methods differ by at most 0.084 K. FFT is the default.
8.3.3 Inlet and outlet temperatures
With the field heat rate (+ injection) and the heat-capacity flow of the whole field, the fluid enters warmer than the mean when heat is injected:
The classic monthly method writes the same relation with its opposite sign. For monthly output from an hourly run, the base value of month is the temperature of its last hour, and the peak values are the minimum and maximum over its 730 hours.
8.4 Warnings
Every result carries warnings when:
- the flow is laminar (Re < 2300);
- the minimum or maximum mean fluid temperature violates the design limits;
- the minimum fluid temperature is within 1 K of the freezing point;
- H lies outside 20–300 m, or B/H outside 0.02–0.5 (the range of the classic g-function library; BoreTherm still computes);
- all loads are zero;
- sections change the borehole radius while the g-function uses the mean radius (Chapter 11), or two inclined axes come closer than 1 m (Chapter 13).
The monthly and hourly temperatures above use the steady borehole resistance. The short-time borehole model adds the heat capacity of fluid, pipes and grout to the hourly values and the peaks (Chapter 15); the fluid temperatures along strings of boreholes are in Chapter 14.